2022 Fiscal Year Updates

At the June 17th board meeting, the South Fork Kings Board approved the budget for the 2022 Fiscal Year. Here are a few items to note from that discussion.

Board levies $9/year assessment

The South Fork Kings GSA Board approved a resolution pursuant to South Fork Kings GSA’s 2018 Proposition 218 election, which authorized the Board to levy a five-year assessment up to the maximum of nine dollars and eighty cents per acre per year for SGMA implementation. The Board authorized an assessment of landowners for $9.00 per acre for fiscal year 2021-2022.

Board approves Geosyntec’s work orders for Fiscal Year 2022

Amer Hussain, a Geosyntec representative, presented task orders for the year as outlined by the Fiscal Year 2022 budget. Over the course of the year, Geosyntec will be performing the following task orders:

  1. Project Coordination/Meetings.
  2. Aquifer Storage and Recovery (ASR) Pilot Test- Geosyntec will finalize the ASR report to be submitted to the Regional Water Quality Control Board and Division of Drinking Water.
  3. ASR CEQA Document- A programmatic Environmental Impact Report under CEQA will be drafted and submitted to the Regional Water Quality Control Board.
  4. Groundwater Monitoring Program- This work will involve collecting semi-annual water level measurements, reviewing and evaluating GSA thresholds and objectives, and upholding commitments to monitoring programs as stated in the Tulare Lake Subbasin’s Groundwater Sustainability Plan (GSP).
  5. Database management.
  6. Grants- Geosyntec will research, manage and coordinate funding opportunities that South Fork Kings KGSA may qualify for and pursue.
  7. Project Design- Geosyntec will prepare and plan initial conceptual plans for project(s) and provide description of project(s) for the Tulare Lake Subbasin Annual Report.
  8. Surrounding Basin Coordination.
  9. Monitoring Well- The GSP identified five data gaps and outlined that five wells would be installed over time to gather that data. Geosyntec will coordinate the installation of a B-Zone well within a beneficial location to the GSA.

Separately, Geosyntec requested additional funds of $15,000 for the work they did to prepare the Water Year 2020 Annual Report on behalf of the Tulare Lake Subbasin. Additionally, Geosyntec also requested funding to prepare Water Year 2021’s Annual Report. Geosyntec anticipates that the Tulare Lake Subbasin will receive their comments from DWR on their GSP and then have 180 days to respond to these comments. Geosyntec is tasked with responding to these comments.

SFKGSA is only responsible for 15% of the fees charged to the Tulare Lake Subbasin for Annual Report work.

The Board approved these items.

Land IQ will provide important data to calculate groundwater extraction in the region

A one year contract with Land IQ was also approved by the South Fork Kings GSA Board. Land IQ will provide South Fork Kings GSA with evapotranspiration data, precipitation data, and land-use/crop data at a parcel level. This data will then be used to calculate groundwater extraction information.  Amer Hussain explained that in these calculations, surface water that is brought into the region will have to be subtracted. Land IQ will be directly contracted with South Fork Kings GSA to carry out this work.


Monitoring well will help to fill data gap identified in Groundwater Sustainability Plan

A monitoring well will be installed West of Stratford along Laurel Avenue using a sonic drilling method. The well will be 350 feet deep and 4 inches in diameter. This well will allow for water monitoring and sampling, providing missing data about water levels and quality that are necessary for effective implementation of the Groundwater Sustainability Plan.

Aquifer Storage and Recovery Pilot Test begins

South Fork Kings GSA is carrying out an Aquifer Storage and Recovery (ASR) pilot test, an innovative groundwater management method that involves injecting water for underground storage to be withdrawn later. Click here to learn more about the background behind the South Fork Kings GSA ASR Pilot Test.

The test began Monday, June 21st. South Fork Kings GSA is not using Lemoore Canal water, but the GSA is using their canals to carry out the test. The water for the test was purchased from a landowner. However, because the water will be returned, South Fork Kings GSA will only be paying for any water that is lost during the test.

The water will be injected for 30 days at approximately 800 gallons per minute and stored for 60 days. During this time, water levels in surrounding wells and the quality of the water injected will be monitored.

The water will then be extracted around September and returned to the landowner. The amount of surface water that is extracted and returned will be tracked. This will help the GSA to determine the efficiency of the test and how much water (if any) was not recovered.

In the future, this process could allow excess surface water to be stored in aquifers for future use in dry periods. Storing surface water and extracting it at the best time could play an important role in maximizing surface water supply in the region.

Sign up for our Interested Persons list to receive regular updates on this ASR Test and other activities going on in the GSA!

Survey mailed to landowners to determine drought impacts on groundwater

South Fork Kings GSA is conducting a series of surveys with landowners to better understand groundwater and land use in their area. The first survey in this survey is designed to help the GSA better understand landowners’ perspectives on how climate and drought impacts their groundwater supply.

The survey was in homes the second week of June. Landowners who submit their survey by June 30, 2021 will be entered to win one of fifteen $50 Amazon gift cards. The survey can also be taken online here.

Our goal as the South Fork Kings Groundwater Sustainability Agency (GSA) is to achieve a sustainable groundwater supply that is strong through cycles of drought. This survey series will help the South Fork Kings GSA better serve its landowners and stakeholders by helping us better understand their needs and the groundwater supply they rely on.

Airborne Electromagnetic Survey will help South Fork Kings GSA make groundwater management decisions

The Department of Water Resources has received funding from a Proposition 68 grant to conduct Airborne Electromagnetic (AEM) Surveys throughout the state.

During an AEM survey, a helicopter tows electronic equipment that sends signals into the ground which bounce back. The process has been compared to taking an MRI of the ground’s subsurface. The data collected is used to create continuous images that are interpreted for underground geology. The resulting information will provide a standardized, statewide dataset that improves the understanding of aquifer structures. It can also help with the development or refinement of hydrogeologic conceptual models and can help identify areas for recharging groundwater. (DWR)

These AEM Surveys will begin in Salinas valley, then move toward the southern Central Valley and work their way north. The data collected by the AEM survey will allow South Fork GSA to make informed groundwater management decisions, like what areas of the agency are ideal for recharging groundwater during wet years. After the flight has taken place, it will take about 6 months to get the AEM results from DWR.

The success of this survey is dependent on driller logs and the collection of other pieces of data. Stanford University and Dr. Rosemary Knight, are conducting additional subsidence modeling, digitizing well driller logs and well completion reports, and are looking to utilize NASA funds for this work. SFKGSA will write a letter of support for Dr. Rosemary Knight to show NASA that there is a need and interest in the collection of this data.

Translate »